Job DescriptionTOBERITE® Precast Panels

A.I.P is one of Adelaide’s leading precast manufacturing companies. Seels Technology have been working closely with A.I.P to test TOBERITE® in precast panels.

TOBERITE® precast was mixed and delivered by Boral to A.I.P. The formwork and steel fixing was completed by A.I.P prior to the pour.  TOBERITE® was vibrated, screeded and trowelled at a slump of 120mm.

The panels were able to be lifted within 15 hours of being poured. There were no obstacles that we had to overcome throughout the duration of the pour. Overall AIP were impressed with the workability of TOBERITE® and the increased productivity of the entire job.

The workability and screeding of TOBERITE® is great, the early stripping of formwork and early lifting capabilities from the steel casting beds will improve production rate.”  T H – Director A.I.P